by Colleen Barry-Sleicher
Need
to get some work done on your Manhattan building or apartment? This
information from a home improvement expert will make the job easier...
BUILDING HISTORY
Brownstones have been a part of New York City since the 1800’s.
NYC cooperative and coop buildings are designated as either pre-
or post-war buildings referencing WWII. Think of renovations in
these buildings as dealing with squared off areas, whether it is
a section of one floor or a vertical section of a building having
more than one floor in a single residence.
Pre War Buildings
In pre-war buildings walls are made of gypsum block along with metal
lath or steel studs. The floors and ceilings tend to be very thick.
Post War Buildings
Gypsum block was used in 1960’s buildings, plaster in the 1970’s,
and sheetrock for more modern buildings. The basic structure is
made up of plaster, cement and steel. Since these materials are
very dense and less flexible than pre-war buildings they tend to
transmit sound. Often soundproofing is needed under floors.
Difference in building materials
Many of the luxury buildings in NYC were built prior to 1960. There
have been many innovations in construction in the past 50 years.
Metallurgy has contributed many new products in building and building
maintenance. For example, copper water pipe and synthetic rubber
are used more now. The use of lead or lead containing products is
now prohibited. When you are removing older paint there are specific,
regulated ways to do it to avoid breathing in toxic substances that
were used before they were banned. Paint may not be stripped with
heat or dry sanding. Chemical strippers can be used because the
old paint does not go into the air. Plaster walls and ceilings will
probably require a thin plaster layer (skim coat) to be applied
to make the surface smooth. This will seal any lead containing paint
layers in place. Asbestos was used in plaster, floor tile and many
other products in buildings prior to 1979. Now, a certified removal
company must perform any asbestos removal.
RENOVATION PROJECTS
Property owners will be required to put in time during the planning
stage. It is important to research and feel comfortable with the
designer. You must be on the same page or you will never get the
look you want. When selecting a designer, keep in mind a project
can grow beyond the skill level of the designer. Interview several
designers. Prior experience and knowledge will determine their suitability
for any project. Any delay in selecting or approving layouts, drawings,
work items or materials will cause delays that will cause more delays.
One missing detail or purchase item may delay huge blocks of work.
Architects and Designers
Interior designers are trained in architectural design as well as
soft goods selection. Often a design firm has architectural designers
working for them. Architects are more involved in the methods of
construction. Aspects of the project such as electrical device location
and type, air conditioning, plumbing fixtures, walls and ceilings,
architectural woodwork are of more interest to the architect. The
importance of good planning with the architect and designer influences
the project progress. For example, the bathroom fixtures may have
an impact on how the tile work is installed. Doorway dimensions
will determine the light switch location.
Contractors
All contractors performing work on a private New York City residence
must be licensed by the NYC Department of Consumer Affairs (DCA)
as a Home Improvement Contractor (HIC). Plumbers and electricians
are licensed by the NYC Department of Buildings. Architects are
licensed by the State. Decorators and interior designers are not
required to be licensed.
Prepare a detailed plan of what you want accomplished before interviewing
contractors. A complete project specification must be developed
for a contractor to prepare a realistic estimate of time, materials
and cost for the home improvement project. Do not change the plan
as you speak to different contractors. You will not be getting an
“apples to apples” quotation. The contractor with the higher price
may be including an aspect of the project you did not make clear
to another contractor. Project specifications that are incomplete
are a roadmap for disaster.
When choosing a contractor the homeowner should consider general
knowledge, existing customer projects, references and reputation.
The homeowner might consider using the services of a contractor
referral agency. The referral agency offers the homeowner a pool
of contractors who have been screened and matched to a particular
project. Selecting a contractor who is inexpensive, inexperienced
and in over his head can only lead to disappointment.
Cost
There are two variables that determine the final cost of each project:
- Core Work
– walls, floors, ceilings and everything that is behind
these surfaces and
- Finish Work
– moldings, trim, final skim plaster coat, marble, tile,
and cabinetry.
Quality of
the workmanship and the level of finish will vary between different
contractors. Core Work, behind the scenes, construction cost are
often similar from contractor to contractor. The cost of the Finish
Work will be determined by how much you are willing to spend and
the skills of the contractor performing this work. This finish work
will have the widest variance in pricing and final appearance of
the renovation. Finish materials such as stone and woodworking will
have quality price differences.
Contracts
All contracts for home improvement in NYC must include the address
and phone number of the contractor, the contractor and salesman
license numbers, estimated dates when the work will start and be
substantially complete, description types of material, a notice
that all monies received will be deposited in the contractors account
and be used for no other propose than to provide payments as stated
in the contract, a schedule of progress payments showing the amount
or each payment and the application of that payment in some relationship
to the progress of project completion or materials to be purchased,
all limitations, representations and warranty, a statement and insurance
certificate.
Project
Contractors will give a schedule of the work to be performed. Building
guidelines can have a great affect on the project timeline. Over
the course of the job many man-hours are lost just getting in and
out of a building. Building Hours are often 9AM-4:00 or 4:30. Building
may have restrictions on the amount of time any job can last. There
may be restrictions on the service elevator usage or water shut
off times and planning. Buildings are careful concerning site protection.
Good contractors take extra steps to protect the building and the
clients living space. Site Protection includes protecting existing
floors and dust control with exhaust fans for example.
Projects are divided into two phases. The first phase includes the
behind the scenes construction including the walls, floors, ceilings
and everything that is behind these surfaces. The second phase is
the “Finish Work”, which is the woodworking, cabinetry, final skim
coat, marble tile and moldings. A majority of work will be behind
the scenes. The first phase is often the most costly and time consuming.
As mentioned earlier planning is very important. Many rooms are
defined by any changes including wall locations, plumbing and water
supply locations, electrical requirements and HVAC installation.
Sample Renovation Project Tasks:
Demolition and debris removal. Contractors often use
their own employees to insure quality.
Inspection for leaks or damage behind walls, tiled
areas, floors, etc.
Repair and prep behind the scenes areas with any needed protective installation or sealants.
Plumbing and electrical installation.
Electrical riser work.
Cutting through existing wall for design changes.
Framing of new walls, partitions, etc.
Complete walls
Smooth and level floors, walls and ceilings for cabinets,
vanities, tiling, floor installation, etc.
Install new floor areas.
Complete ceiling changes.
Complete tiling.
Install appropriate fixtures such as tub.
Complete doorway framing and interior window frames
Complete surface electrical work such as ceilings lights, lights with cabinetry, etc.
Install cabinetry, appliances, vanities, counter tops, etc.
Complete surface flooring.
Complete fixture installation.
Complete crown-molding, millwork, trim work, woodworking and carpentry.
Final plaster skim coat.
Floor protection and painting.
Complete painting.
Faux Finish, wallpaper, murals if needed.
Keep the following points in mind during a renovation:
The finish items will affect the way the rough plumbing
and electrical work will proceed.
Walls cannot be closed until the inspection is performed.
Projects, such as painting, cannot be rushed and still come out correctly.
Changes, deletions, additions, client approval and any missing specifications or items will cause delays in the job completion date.
Contractors do not look forward to changes and additions, they have schedules and other projects they want to move forward on.
Job site meetings usually produce some modifications or changes.
There will usually be some minor changes that will result in added costs.
There
is always a ripple affect on any contractor's job schedule when
poor planning takes over.